The production line crushes tungsten ore and feeds it into X-ray beneficiation machinery, then the materials enter grinding process and beneficiation production line, and finally we will obtain fine tungsten ore. The equipment runs steadily and well.
After crushing and dry separation, the finished product has a grade of 58-60%, and the finished product is transported to China's steel mills through Erenhot Port. In addition, the production line has the characteristics of large capacity and high efficiency
The gold ore beneficiation line is located in Zimbabwe. Raw materials are processed to go into ball mill and then leached by cyanide. In the early processing stage, the gold ore is processed into a reasonable size by means of two-stage closed-circuit crushing process with jaw crusher and cone crusher
The machines are running very well and the capacity is beyond my expectations. The hydraulic adjustment of the European Type Impact Crusher reduces the maintenance time greatly.
The equipment of Industry not only successfully accomplished the production tasks, but exceeded my expectations. Owing to the high production efficiency of equipment and satisfactory service of engineers
I have followed the views engineer with a two-stage crushing: a PE Jaw Crusher for primary crushing and two Hydraulic Cone Crusher for secondary crushing.